logo
Home ProductsStrut C Channel

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Certification
China Shanghai KOKA Industrial Co., Ltd. certification
China Shanghai KOKA Industrial Co., Ltd. certification
I'm Online Chat Now

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel
Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Large Image :  Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Product Details:
Place of Origin: Shanghai
Brand Name: KOKA
Certification: ISO9001 2015
Model Number: KK-4142
Payment & Shipping Terms:
Minimum Order Quantity: 100PCS
Price: Sent Email to us
Packaging Details: Pallet Packing,customized requirement
Delivery Time: 10-25 work days
Payment Terms: L/C,D/A,D/P,T/T,Western Union,
Supply Ability: 999999/pcs/month

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Description
Package: Carton Box Service: OEM ODM
Specification: 41*41 41*21 41*62 41*82 Thickness: 1.5-3.0MM,any Thickness Available
Certification: ISO9001-2015 Surface Finished: Pre-galvanized,Hot Dip Galvanized,Powder Coating
Length: 1-6M ,Any Length Available Material: Q235,Stainless Steel 304/316
Highlight:

Black Powder Coat Unistrut Channel

,

Back to Back U Profile Strut Channel

,

Data Center Construction Strut Channel

Data Center Construction Black Powder Coat Back to Back U Profile Unistrut Strut Channel

Products: Back to Back Strut Channel

Pre-galvanized(GI)strut channel, hot dip galvanized(HDG) strut channel, stainless steel 304 (ss304) strut channel, stainless steel 316 (ss316)strut channel, standard length : 3m/5.8m/6m, all length available, slotted strut channel and solid strut channel are also available.

Features: 

1) easy & flexible in installation, low cost
2) samples & catalogs are free
3) all sizes are available

4) OEM/ODM

Applications:

Koka strut channel is commonly used for trapeze supports, cable tray supports, seismic bracing, ceiling grids, pipe support, conduit, duct, racks, solar mounting, HAVC systems, and other general framing.

Specifications: 

Koka strut is available in Pre-Galvanized (PG), Hot-Dip Galvanized (HDG), Powed Coating(PC),  Plain (PL), Green (GR), Zinc Dichromate (ZD), Stainless Steel (SS or ST) and Aluminum (EA). Solid. Punched holes are also available for ease of installation.

Part No. Size Thickness(mm) Length(m) Finish
KK-4121 41x21 (1-5/8x13/16) 1.5/2.0/2.5 2.4/3/5.8/6 PG/HDG/PC/SS304/SS316
KK-4141 41x41 (1-5/8x1-5/8) 1.5/2.0/2.5 2.4/3/5.8/6 PG/HDG/PC/SS304/SS316
KK-4162 41x62 (1-5/8x2-7/16) 1.5/2.0/2.5 2.4/3/5.8/6 PG/HDG/PC/SS304/SS316
KK-4182 41x82 (1-5/8x3-1/4) 1.5/2.0/2.5 2.4/3/5.8/6 PG/HDG/PC/SS304/SS316
KK-4125 41x25 (1-5/8x1) 1.5/2.0/2.5 2.4/3/5.8/6 PG/HDG/PC/SS304/SS316


Product Show:

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C ChannelData Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C ChannelData Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C ChannelData Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C ChannelData Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C ChannelData Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C ChannelData Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel


About KOKA:

Shanghai KoKa Industrial Co.,Ltd is a professional cable management systems (CMS) & Strut Framing systems and HVAC systems solutions provider,manufacturer .

Based on over 15 years of engineering experience to the subways, airports, shopping malls, food, beverage, petrochemical ,and pharmaceutical industries, the KOKA production of stainless steel products has become a respected and specified brand to some of the world's most recognised organisations.

KOKA products are known throughout the industry as being hygienic, high quality and to offer exceptional value.

KOKA offer an extensive range of products ex-stock and can therefore process your orders with a short lead time, with the majority of parts available on a next day delivery.

KOKA specialises in manufacturing the following products in SS304 , SS316 ,carbon steel.

KOKA to provide personalized demand and global sourcing solutions for global customers,always adhere to the product quality first,Continuous development and optimization design, with user-friendly, simple installation to satisfied customer needs, and strive to reduce customer costs, to adapt to the global competition, With global customers to cope with the complex economic environment, to achieve common value growth of the target.

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Package:

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C ChannelData Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

Data Center Construction Black Powder Coat Back to Back Strut Channel Unistrut C Channel

FAQ:

Q1: Are you manufacturer?
A: Yes,we are factory ,We have stamping and injection factories.
Q2: What services can we offer?
A: We can OEM and ODM,We have a strong design team,we can provide drawing.
Q3: What information need for quotation?
A: For example:

1: what material(carbon steel/Q235/SS304/SS316)

2: what size do you need ?
3: what surface finished( zinc plate/HDG/powder coating/copper plated)?
Q4: Do you provide free samples?
A: Yes ,you can get the free samples
Q5: What is your payment terms?
A: 30% T/T deposit,balance will be against each copy of B/L;
Q6: How about the delivery time?
A: According to your order list and quantity,Normally delivery in 20-25days.

Contact Details
Shanghai KOKA Industrial Co., Ltd.

Contact Person: Katrina

Tel: 18917512172

Fax: 86-21-60488958

Send your inquiry directly to us (0 / 3000)